Sr. No. |
Project Name |
Length of Project (kms) |
Client |
Period |
1 |
Consultancy Services for Project Management Phase I including Preparation of Detailed Project Report of Selected Stretches/Corridors of National Highways/State Roads (Approved “in principle” for declaration as National Highways) in the State of Telangana for up gradation to Two/Four lane with Paved Shoulder configuration of Deverkonda – Peddavuru – Miryalaguda - Kodad. |
Length: 117.626 Kms; (42.346 Kms, 4 lane & 5.28 Kms, 2 lane) |
Roads & Building Department, Kalwalurthy |
Nov’2016 to Dec’2017 |
Major Bridges |
1 No. |
2 |
Consultancy Services for Preparation of DPR for Review of Capacity of Nagpur-Bhandara Road NH-53 (Old NH-6) in the State of Maharashtra for 6-lane configuration. |
Length: 68.565 Kms; (59.365 Kms, 6 lane; 9.20 Kms, 4 lane) |
National Highways Authority of India, PIU Nagpur |
Mar’2017 to Jan’2018 |
Major Bridges |
8 Nos. |
Flyover |
04 Nos. |
3 |
Consultancy Services for Carrying out Feasibility Study, Detailed Survey/investigation, Alignment Option, Preparation of General Arrangement Drawing and Engineering Report for Construction of Proposed ROBs & their Approaches in replacement of Existing Level Crossings as per finalized RFP in the State of Andhra Pradesh (Package-2) |
14 Nos. ROB |
Ministry of Road Transport & Highways, New Delhi |
Sep 2014 to Jun 2017 |
4 |
Consultancy Services for Carrying out Feasibility Study, Detailed Survey/investigation, Alignment Option, Preparation of General Arrangement Drawing and Engineering Report for Construction of Proposed ROBs & their Approaches in replacement of Existing Level Crossings as per finalized RFP in the State of Andhra Pradesh (Package-1) |
15 Nos. ROB |
Ministry of Road Transport & Highways, New Delhi |
Sep 2014 to Jun 2017 |
5 |
Consultancy services for project management phase-I including preparation of detailed project report of selected stretches/corridors of National Highways/State roads (Approved “in principal “for declaration as National Highways) in the state of Telangana for up gradation to two/four lane with paved shoulder configuration -Khammam-Ashwaraopet (Length: 120 Km) and Khammam to Devarapalle as Greenfield Alignment for Length of 162 km |
Length: 282 Kms; 4 lane |
National Highways Authority of India, Khammam |
Dec’2016 to Nov’2018 |
Major Bridges |
18 Nos. |
RoB |
2 Nos. |
6 |
Consultancy services for preparation of DPR for Development of Economic Corridors, Inter Corridors, Feeder Routes& Green Field Alignment to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Package 7/Lot-4), in the State of Rajasthan on EPC Mode. |
Length: 208.255 Km, 6 Lane |
National Highways Authority of India, PIU Jodhpur |
Feb’2018 to Jan’2019 |
(Greenfield Alignment) |
Major Bridges |
10 Nos. |
RoB |
2 Nos. |
Underpasses |
VUP – 19 Nos. |
LVUP – 34 Nos. |
SVUP – 85 Nos. |
7 |
Consultancy Services for Feasibility Study, Detailed Project Report, Survey, Preparation of Land Plan Schedules for Widening to Two/Four lane with Paved Shoulder from Km 0.000 to Km 130.000 of NH-563 on Jagtiyal-Karimnagar-Warangal Road in the State of Telangana on EPC Mode. |
Length: 117.820 Km, 4 Lane |
National Highways Authority of India, PIU Warangal |
Dec’2015 to Jan’2019 (Draft DPR Submitted) |
Major Bridges |
14 Nos. |
ROB / RUB |
RUB : 1 No. |
ROB : 1 No. |
Underpasses |
VUP : 40 Nos. |
LVUP : 32 Nos. |
8 |
Consultancy Services for Preparation of DPR for Development of Economic Corridors, Inter Corridors, Feeder Routes and Coastal Roads to improve the efficiency of freight movement in India (Lot-1/Telangana/Package-2) Armoor-Jagtial Section of NH-63 and Jagtial-Ramagundam Section of NH-563. |
Length: 125.414 Km, 4 Lane |
National Highways Authority of India, PIU Mancherial |
Apr’2017 to Nov’2018 (Draft DPR Submitted) |
(Green Field Alignment) |
Major Bridges |
8 Nos. |
Flyover |
07 Nos. |
Elevated Section |
0.5 Km |
Underpasses |
37 Nos. |
9 |
Consultancy Services for Feasibility Study and Preparation of Detailed Project Report for Two lane with Paved Shoulders including Strengthening of Ratnagiri – Kolhapur Section of NH-166 from Km. 0/000 to Km. 137/285 in Ratnagiri and Kolhapur District in the State of Maharashtra |
Length: 133.08 Km (125.08 Kms, 4 lane & 8.00 Kms, 2 lane) |
National Highways Authority of India, PIU Kolhapur |
Jun’2015 to Aug’2017 |
Major Bridges |
09 Nos. |
Flyover |
08 Nos. |
RoB |
01 No. |
Tunnel |
03 Nos. |
10 |
Consultancy Services for Preparation of Detailed Project Report (DPR for 4 laning of Meerut-Nazibabad Section of NH-119 in the State of Uttar Pradesh. |
Length: 94.20 Kms; 4 lane |
National Highways Authority of India, Project Implementation Unit, Meerut |
Sep’2015 to Sep’2017 |
Major Bridge |
05 Nos. |
ROB |
01 No. |
11 |
Preparation of Feasibility-cum-Preliminary Design for 4/6-Laning of Nagpur Wainganga Bridge Section of N.H. 6 |
Length: 58.63 Km; 4 Lane |
National Highways Authority of India, Project Implementation Unit, Nagpur |
Nov’2009 to Dec’2012 |
Major Bridge |
5 Nos. |
Flyovers |
2 Nos. |
12 |
Preparation of Feasibility Study cum Preliminary Design for 4/6 lanning of Nagpur-Saoner Section of N.H. 69 |
Length: 56.30 Km; 4 Lane |
National Highway Authority of India, Project Implementation Unit, Pandhurna, |
Nov’2009 to Jan’2011 |
Major Bridge |
2 Nos. |
ROB |
05 Nos. |
Flyovers |
2 No. |
13 |
Consultancy Services for Preparation of Feasibility Report and Detailed Project Report (DPR) for 4 laning of Nagpur - Umred - Chandrapur M.S.H. 9 Road from Km. 6/500 to Km. 83/100 in Nagpur District Length 76.60 Kms; 4 lane |
Length: 76.60 Km; 4 Lane |
Public Works Division No. 3, Nagpur |
May’2013 to July’2013 |
Major Bridge |
03 Nos. |
Flyovers |
1 No. |
14 |
Consultancy Services for Preparation of Feasibility Study and Detailed Project Report for the wotk of Selected Corridors of Road Networks in the State of Maharashtra for up gradation to Two lane with Paved Shoulders/Four lane configuration for the work of Amravati (Nandgaon) – Morshi – Warud – Pandhurna Road. |
Length: 95.39 Km; 4 Lane |
National Highway Division, Akola |
July 2016 to June 2017 |
Major Bridge |
3 Nos. |
15 |
Consultancy Services for Preparation of Detailed Feasibility Report for the Four Laning with paved shoulders of Gorakhpur to Deoria Road (SH-01) in Uttar Pradesh |
Length: 36.050 Km; 4 Lane |
Uttar Pradesh State Highways Authority, Lucknow |
Jan’2015 to Apr’2015 |
Major Bridge |
02 Nos. |
Flyovers |
02 No. |
16 |
Consultancy Services for Preparation of Feasibility Report cum Detailed Project Report (DPR) for Capacity Augmentation to 2 lanes with Paved Shoulders Configuration of National Highways in the State of Uttar Pradesh for Package-VII, 4-laning of NH-56 (about 10 Km. length) including ROB. |
Length: 17.25 Km; 4 lane |
Ministry of Road Transport & Highways, New Delhi |
Jan 2015 to Dec 2016 |
Flyover |
01 No. |
ROB |
01 No. |
17 |
Preparation of DPR for 13 Roads across the State of Madhya Pradesh . |
Length: 439.75 Km; 2 Lane |
Madhya Pradesh Road Development Corporation Limited, Bhopal |
May’2009 to Dec' 2012 |
Major Bridge |
11 Nos. |
18 |
Preparation of Feasibility Report for Two lanning with paved shoulder of Katni-Shahdol-Anoopur to MP/CG Border of Nh-78 |
Length: 234.00 Km; 2 Lane |
Madhya Pradesh Road Development Corporation Limited, Bhopal |
May’2013 to Aug’2015 |
Major Bridge |
7 Nos. |
ROB |
8 Nos. |
19 |
Consultancy Services for Project Management including Preparation of Detailed Project Report of selected Stretches/Corridors of National Highways for up gradation to Two/Four lane with Paved Shoulder configuration – Package 8 : Stretch starting from Gondkhairi – Sangam – Wanadongri – Hingna – MIHAN – Gumgaon – Salaidhaba – Butibori – MIDC – Takalghat – Asola – Seldoh – Singhi Rly – Hamdapur – Sewagram – Wardha NH 361. |
Length: 87.74 Km; 2 lane |
National Highway Division, Nagpur |
July 2016 to June 2017 |
Major Bridge |
6 Nos. |
20 |
Consultancy Services for Preparation of Feasibility Study and Detailed Project Report for the work of Selected Corridors of Road Networks in the State of Maharashtra for up gradation to Two lane with Paved Shoulders/Four lane configuration for the work of Amravati (Nandgaon) – Morshi – Warud – Pandhurna Road. (Yawli – Khed – Atner – As Variation) |
Length: 56.36 Km; 2 lane |
National Highway Division, Akola |
Sept 2016 to June 2017 |
Major Bridge |
2 Nos. |
21 |
Consultancy Services for Feasibility Study and Detailed Project Report Preparation for Two laning of Joram – Koloriang Road from Km 70.00 to Km 138.00 (Length 68 Km) in the State of Arunachal Pradesh under Arunachal Pradesh Package of SARDP-NE on EPC Mode. |
Length: 62.99 Kms; 2 lane with Paved Shoulder |
National Highways & Infrastructure Development Corporation Ltd. |
Aug’2015 to Aug’2017 |
22 |
Consultancy Services for preparation of Feasibility Study and Detailed Project Report for 2 laning /2 lane with paved shoulder of Champai – Seling section of NH-6 in Mizoram under SARDP Phase-B on EPC mode. |
Length: 140.04 Km; 2 lane |
Ministry of Road Transport & Highways, Guwahati |
May 2015 to June 2017 |
Major Bridge |
02 Nos. (Length 80m & 89.10m) |
23 |
Consultancy Services for Project Management including Preparation of Detailed Project Report of Selected Stretches/Corridors of National Highways/State Roads (approved “In Principle” for declaration as National Highways) in the State of Andhra Pradesh for up gradation to Two/Four lane with Paved Shoulder configuration (CS Puram – Singarayakonda (on NH 16) Road Section)”. |
Length: 90.00 Km; 2 lane |
Roads & Building Department, Hyderabad |
July 2016 to Mar 2017 |
Major Bridge |
2 Nos. Length (75m, 60m) |
24 |
Consultancy Services for Preparation of Detailed Feasibility Report for the Four Laning with paved shoulders of Deoria to Balia Road (SH-01) in Uttar Pradesh |
Length: 107.60 Km; 2 Lane |
Uttar Pradesh State Highways Authority, Lucknow |
Jan’2015 to Apr’2015 |
Major Bridge |
10 Nos. |
25 |
Consultancy Services for preparation of DPR for Development of Expressways, Economic Corridors and Inter Corridors under Bharatmala Pariyojna Phase-II (Lot-09 Package-I) |
Length: 748.00 |
National Highways Authority of India,New Delhi |
Apr’2021 – Till Date |
26 |
Consultancy Services for Preparation of DPR for Development of Northern Portion of Hyderabad Regional Ring Road Expressway under BharatmalaPariyojana Phase-I in the State of Telangana. |
Length: 160.00 Km, 4 lane |
National Highways Authority of India,New Delhi |
Jul’2021 – Till Date |